Endesco has been a key team player on most of the mega transportation infrastructure projects in the greater Washington/Baltimore metropolitan areas since the time Design-Build projects were gradually adopted by DOTs as a popular procurement and delivery method for major transportation infrastructure projects.
We have successfully delivered, or are delivering, professional engineering services on the following projects:
Project Name |
Owner & Construction Cost |
Completion Year |
Services Provided by Endesco |
---|---|---|---|
Hampton Roads Bridge-Tunnel Expansion Project, Cities of Hampton and Norfolk, VA |
VDOT Estimated $3.8B |
Design: 2021 Construction: 2025 |
· Drainage Design, · Hydrology & Hydraulics Analysis, · Phased Erosion & Sediment Control, · Stormwater Management, · Lighting Design (lighting warrant analysis, AGI32 photometric analysis, roadway lighting, bridge trestle lighting, bridge underdeck lighting, sign lighting, navigational channel lighting, temporary lighting during construction) |
The Maryland-National Capital Purple Line Light Rail Project in Montgomery and Prince George’s Counties, MD |
MDTA/MDOT Estimated $2.65B |
Design: 2020 Construction: 2023 |
· Drainage Design, · Hydrology & Hydraulics Analysis, · Phased Erosion & Sediment Control, · Stormwater Management, · Traffic Engineering (traffic signals, street lighting, pavement marking, traffic signing) · Lighting (WMATA station lighting, University of Maryland roadway lighting, maintenance yard lighting, school parking lot lighting, landscape lighting) |
Chesapeake Bay Bridge and Tunnel Project, Virginia Beach, VA |
VDOT Estimated $756M |
Construction: 2024 |
· Structure review |
Route 7 and Battlefield Parkway Interchange, Loudoun County, VA |
VDOT Estimated $66M |
Design: 2020 Construction: 2021 |
· Drainage Design, · Erosion & Sediment Control Plans, · Hydrology & Hydraulics Analysis, · Stormwater Management |
Transform 66 P3 Project, Northern Virginia |
VDOT Estimated $3.7B |
Design: 2020 Construction: 2023 |
· Drainage Design, · Erosion & Sediment Control Plans, · Hydrology & Hydraulics Analysis, · Scour Analysis, · Stormwater Management, · Traffic Engineering |
St. Elizabeth’s East Campus Parking Lots, Washington, DC |
DC DGS Estimated $11M |
Design: 2018 Construction: 2019 |
· Stormwater management · Drainage Design · Erosion and Sediment Control. · Grading Design |
St. Elizabeth’s Hospital’s Development (Phase 1), Washington D.C. |
DC DGS Estimated $1.9B |
Design: 2017 |
· Streetlighting Design |
Washington Metro Silver Line/Dulles Metrorail Phase II, Northern Virginia |
MWAA (following VDOT guidelines) $1.3B |
Design: 2017 Construction: 2021 |
· Drainage Design, · Erosion & Sediment Control Plans, · Hydrology & Hydraulics Analysis, · Permitting Services, · Stormwater Management |
I-95 Express Lanes in Northern Virginia |
VDOT $922M |
Design: 2013 Construction: 2015 |
· Drainage Design, · Erosion & Sediment Control Plans, · Hydrology & Hydraulics Analysis, · Post Design Services, · Stormwater Management |
I-395 HOV Ramp at Seminary Road with I-395 NB Auxiliary lane Extension, Northern VA |
VDOT $55M |
Design: 2013 Construction: 2015 |
· Drainage Design, · Erosion & Sediment Control Plans, · Hydrology & Hydraulics Analysis, · Stormwater Management, · Post Design Services. |
I-64/ Route 15 (Zion Crossroads) Interchange Improvement, Louisa County, VA |
VDOT $6.9M |
Design: 2013 Construction: 2014 |
· Drainage Design, · Erosion & Sediment Control Plans, · Hydrology & Hydraulics Analysis, · Stormwater Management, · Post Design Services. |
Intercounty Connector Contracts “B”, Montgomery Co., MD |
MTA/MDSHA $560 M |
Design: 2013 Construction: 2016 |
· Drainage Design, · Permitting, · Phased Erosion & Sediment Control, · Stormwater Management, · Stream Diversion, · Post Design Services |
Intercounty Connector Contracts “A”, Montgomery Co., MD |
MTA/MDSHA $478M |
Design: 2011 Construction: 2012 |
· Drainage Design, · Permitting, · Phased Erosion & Sediment Control, · Stormwater Management, · Stream Diversion, · Post Design Services |
I-895, From: 4.31 km East of Chesterfield/Henrico County Line To: I-295, Henrico Co. VA (Design/Build) |
VDOT $314M |
Design: 2001 Construction: 2003 |
· Drainage Design, · Erosion & Sediment Control, · Hydrology & Hydraulics Analysis, · Stormwater Management |