Owner: MDOT SHA

Description: Performed field inspection of existing ADA facilities (ramps, sidewalks, APS/CPS signals, push buttons), developed signal design plans (APS/CPS design for MD 410 & Toledo Terrace, RRFB design for MD 410 and Chicago Avenue), developed construction cost estimates, addressed reviewed comments, prepared SHA check list and all requirement materials for PS&E.

Leave a Reply

Your email address will not be published. Required fields are marked *

Explore More

DCA Airport terminal north/south exits to George Washington Parkway improvements, Arlington, VA,

Owner: Metropolitan Washington Airport Authority (MWAA) Description: Performed lighting design service. Work included: review as-built plans, conducted field investigation on existing lighting equipment, coordination with stakeholders, performed conduit fill and

Amtrak NEC Susquehanna Bridge Replacement Construction Management Project, Hartford County and Cecil County, MD

Owner: The National Railroad Passenger Corporation (Amtrak) Description: The Susquehanna River Rail Bridge (SRB) between the City of Havre de Grace in Harford County and the Town of Perryville in