Owner: VDOT

Description: This Public-Private Partnership (P3) project provides 33 miles of HOT Lanes from Stafford County to Fairfax County. Endesco performed hydrologic and hydraulic analysis, drainage design, stormwater management, and erosion and sediment control design. Endesco utilized GIS technology to perform drainage area data for all storm drainage systems, MS-19 analysis, H&H analysis and stormwater management design. Endesco prepared all required drainage areas maps for this project. Endesco performed post design services for any drainage related tasks including Field design changes, shop drawing, and as-built plans and computations.

Leave a Reply

Your email address will not be published. Required fields are marked *

Explore More

Transform I-66 Outside the Beltway (Express Lanes in Northern Virginia) (Design/Build), VA

Owner: VDOT, FAM Description: This Public-Private Partnership (P3) project modifies nearly 23 miles of I-66 providing two express lanes alongside three regular lanes from I-495 to Route 29. Endesco provided

Dulles Toll Road Traffic and Revenue Study for MWAA, Virginia

Owner: MWAA Description: We conduct this study for MWAA as a subcontractor to Stantec. Tasks included review of available traffic data and collection of new traffic data. Traffic data collection

Scour Studies for Proposed Culvert and Retaining Wall within the Pecan Ridge Development, MD

Owner: Caruso Homes Description: Scour Studies for Proposed Culvert and Retaining Wall at Horsepen Branch within the Pecan Ridge DevelopmentBowie, Prince George’s County, MD