Owner: Washington Metropolitan Area Transit Authority

Description: In this award-winning project that added a new metro rail station at an economically underdeveloped urban neighborhood, Endesco prepared Traffic Control Plans (TCP) to enable construction of the new WMATA bridge extensions and Metropolitan Branch Trail Bridge over M Street and Florida Avenue. Endesco also performed streetlight design including photometric analysis, duct bank runs, conduit, pole, fixture and luminaires, in compliance with relevant DDOT, NEC, AASHTO and IESNA guidelines and requirements. Endesco also designed the traffic signs and pavement marking for the project, based on MUTCD and DDOT standards.

Leave a Reply

Your email address will not be published. Required fields are marked *

Explore More

Traffic Control Plan for MDSHA D3 Permit, 900 Olney Sandy Spring Road Redevelopment Project, Montgomery County, MD

Owner: Private Description: Endesco provided Traffic Control Plan design and permit application services to assist Christopher Consultants and its client in application of the MDSHA Permit (Form OOC113, Rev 2/24/2021).

DDOT Southwest/southeast Freeway Bridge (Bridge 1103, 1104 and 1109) Rehabilitation, Washington DC

Owner: DDOT Description: Under this major bridge rehabilitation project for DDOT, Endesco is performing lighting design services as a subconsultant to HDR, as an Engineer-On-Record (EOR) for the affected complex