Owner: Fairfax County DOT, VA

Description: We were responsible for the traffic, air quality, and noise analysis for the design/build project. We collected traffic data and developed traffic forecasts and diurnal data for air quality and noise analysis. CAL3QHC was run for CO analysis. MSAT and particulate matter was also addressed. The TNM Model was run for the build conditions. Berms and barriers were recommended to mitigate noise impacts. Three noise barriers were designed for construction. VDOT reviewed and approved the analysis and the reports.

Leave a Reply

Your email address will not be published. Required fields are marked *

Explore More

MDOT SHA Traffic Engineering Services D4, Task 6 – On-Site Traffic Engineer Support

Owner: MDOT SHA Description: Under this task, our staff provides full-time on-site consultant support service to MDOT SHA District 4 (320 W Warren Rd, Hunt Valley) as a Traffic Engineer.

Washington Metro Silver Line/Dulles Metrorail Phase II, Virginia

Owner: Metropolitan Washington Airports Authority (MWAA) Description: In this Design-Build Washington metro rail extension project, Endesco verified, established, and updated existing and proposed drainage areas for all drainage structures. Endesco