Owner: Metropolitan Washington Airports Authority (MWAA)

Description: In this Design-Build Washington metro rail extension project, Endesco verified, established, and updated existing and proposed drainage areas for all drainage structures. Endesco performed inlet, storm sewer, HGL, minor culvert, underdrain, track drain analysis and design. Endesco provided all necessary VDOT and/or WMATA hydrologic and hydraulic analysis reporting information in a format suitable to the reviewing agencies and preparing drainage plans and details necessary for plan approval.

Leave a Reply

Your email address will not be published. Required fields are marked *

Explore More

I-95 Express Lanes in Northern Virginia, Virginia

Owner: VDOT Description: This Public-Private Partnership (P3) project provides 33 miles of HOT Lanes from Stafford County to Fairfax County. Endesco performed hydrologic and hydraulic analysis, drainage design, stormwater management,

Hampton Roads Bridge-Tunnel (HRBT) Expansion, Hampton & Norfolk, Virginia (Design/Build)

Owner: VDOT Description: The largest infrastructure project in the history of Virginia, this $3.9 Billion design-build project will ease this congestion with the addition of twin 2-lane bored tunnels just west of

Transportation and Parking Data Collection for Fairfax County, Virginia

Owner: Fairfax County Department of Transportation Description: We have been providing Transportation and Parking Data Collection services for FCDOT since 2005.