Owner: Washington Metropolitan Area Transit Authority

Description: In this award-winning project that added a new metro rail station at an economically underdeveloped urban neighborhood, Endesco prepared Traffic Control Plans (TCP) to enable construction of the new WMATA bridge extensions and Metropolitan Branch Trail Bridge over M Street and Florida Avenue. Endesco also performed streetlight design including photometric analysis, duct bank runs, conduit, pole, fixture and luminaires, in compliance with relevant DDOT, NEC, AASHTO and IESNA guidelines and requirements. Endesco also designed the traffic signs and pavement marking for the project, based on MUTCD and DDOT standards.

Leave a Reply

Your email address will not be published. Required fields are marked *

Explore More

MDOT SHA On-site Consultant Support at MDOT SHA OOTS TEDD, Hanover, Anne Arundel County, MD

Owner: MDOT SHA Description: Under this task, Endesco staff provides on-site consultant support at the SHA OOTS TEDD office (7491 Connelley Dr, Hanover, MD 21076) as a Project Manager.

Falls Church City Transportation Planning and Engineering Services On-Call (0723-21-TENG), City of Falls Church, VA

Owner: City of Falls Church, VA Description: As subcontractor to AMT, Endesco has performed ten task orders from the City of Falls Church. Completed tasks include: Task 1- Traffic counts

APS/CPS/RRFB Design for Two Intersections on MD 410, Prince George’s and Montgomery Counties, MD

Owner: MDOT SHA Description: Performed field inspection of existing ADA facilities (ramps, sidewalks, APS/CPS signals, push buttons), developed signal design plans (APS/CPS design for MD 410 & Toledo Terrace, RRFB