Owner: VDOT
Description: The largest infrastructure project in the history of Virginia, this $3.9 Billion design-build project will ease this congestion with the addition of twin 2-lane bored tunnels just west of the existing eastbound tunnel and addition of Express Lanes along the 10-mile segment on I-64. The Express Lanes will be managed lanes with dynamic tolling and part-time running hard shoulder lane. Endesco provided lighting design services for all roadways, bridges, underpasses, and navigation channels as a sub consultant, including lighting warrant study, lighting photometric analysis using AGI-32 software, electrical design, and conduit system design. Endesco also provided design services for erosion & sediment control and highway drainage.